# Factory audit in Rohtak: hand tools suppliers

> Factory audit in Rohtak, Haryana: one day on site for USD 298. Suppliers of hand tools and forgings scored on quality, capacity and compliance, with photos.

Source: https://sourcesquid.co/quality/audit/rohtak/

Quality · Haryana

# Factory audit in Rohtak.

SourceSquid audits hand tools and forgings suppliers in Rohtak, Haryana: one day on site for USD 298, with a scored report, photos and an action plan. Rohtak is an established regional cluster, also known for nuts and bolts and fasteners. Our auditor adds the forging questions to the seven areas every audit scores.

[Book an audit](https://sourcesquid.co/quality/book-an-inspection/?type=audit) What the auditor asks

1
    process module for this cluster

USD 298
    per 1-day audit

Quoted
    travel, before booking

Factory audit · **Rohtak** 28.90° N, 76.61° E

  * __Rohtak
  *  __Nearby clusters
  *  __Seaport
  *  __Inland depot (ICD)

From Bengaluru
    1,770 km

Nearest seaport
    Deendayal · 910 km

Fixed price · book online

  * **Factory audit in Rohtak** USD 298 per 1-day audit

[Book at USD 298](https://sourcesquid.co/book/?service=factory-audit&country=India&city=Rohtak) [WhatsApp us](https://wa.me/919840698791?text=Hello%20SourceSquid%2C%20I%20would%20like%20to%20book%20a%20factory%20audit%20in%20Rohtak.)

Rohtak is outside our main clusters, so travel is quoted before booking. You see the exact total before you confirm. Audit day: opening meeting, floor walk, record review, worker interviews and a closing meeting; the scored report follows with a review call.

Process focus

## What our auditor asks in Rohtak.

On top of the [seven areas](https://sourcesquid.co/quality/factory-audit/), the questions for the processes Rohtak runs: hand tools & hardware and forging. Answers are checked against records and the floor.

Hand tools & hardware and Forging

### Forging

  * Do you receive a mill test certificate (EN 10204 3.1) for every bar lot and verify its chemistry on receipt?
  * Are bars identified by grade and heat number, and is heat traceability kept through cutting, forging and heat treatment?
  * How is billet heating controlled?

Floor walk

## The line, step by step.

Our auditor walks the whole process. For Rohtak's products, these are the steps on that walk.

**Fasteners** 6 steps

  1. **Wire rod & annealing** · Rod drawn to size and spheroidise-annealed
  2. **Cold heading** · Heads formed on multi-station headers
  3. **Thread rolling** · Threads rolled for strength and accuracy
  4. **Heat treatment** · Hardening and tempering to property class
  5. **Plating or coating** · Zinc, zinc-flake or hot-dip galvanising
  6. **Testing & packing** · Proof load, hardness and coating checks; boxed by count

[Full guide to fasteners →](https://sourcesquid.co/india-atlas/products/fasteners/)

Capacity

## Volumes and lead times to check against.

The audit compares real output per line and per shift with what you plan to order. These are the usual starting points for Rohtak's processes and products.

[Hand tools & hardware](https://sourcesquid.co/india-atlas/processes/hand-tools-and-hardware/)Typical minimum order
    Often 500–1,000 pieces per item; fasteners by weight or by the thousand.

[Forging](https://sourcesquid.co/india-atlas/processes/forging/)Typical minimum order
    Typically 500–2,000 pieces per part for closed-die forging; open-die work can be a single piece.

[Fasteners](https://sourcesquid.co/india-atlas/products/fasteners/)Typical lead time
    Samples 2–4 weeks, production 4–8 weeks

Made here

## Rohtak, in the Atlas.

Haryana is a manufacturing powerhouse for vehicles and auto components around Gurugram, Manesar and Faridabad, and for home textiles in Panipat. [The Rohtak cluster guide](https://sourcesquid.co/india-atlas/clusters/rohtak/) has the full record.

Known for
    Nutsbolts and fasteners

Materials worked
    [Carbon and alloy steel](https://sourcesquid.co/india-atlas/materials/carbon-steel/)IS 2062 E250 · EN8 / C45 · EN19 / 42CrMo4

Also made in
    **Fasteners**[Faridabad](https://sourcesquid.co/quality/audit/faridabad/) · [Ludhiana](https://sourcesquid.co/quality/audit/ludhiana/) · [Jamnagar](https://sourcesquid.co/quality/audit/jamnagar/)

Factory calendar

## Dates that slow Rohtak factories.

  1. 24 Nov 2026**Guru Nanak Jayanti** Regional: Haryana
  2. 23 Mar 2027**Holi** Regional: Haryana
  3. 17 Aug 2027**Raksha Bandhan** Regional: Haryana
  4. 29 Oct 2027**Diwali** Factories across India slow down or close

Audit days are best booked clear of them, when the full shift is on the floor. Full year: [holiday planner](https://sourcesquid.co/tools/festival-and-holiday-planner/).

Practical

## Ports, travel and languages.

Rohtak is outside our main clusters, so travel is quoted before booking. Distances are straight-line from the city centre.

Cluster
    [Rohtak in the India Atlas](https://sourcesquid.co/india-atlas/clusters/rohtak/)Established cluster in [Haryana](https://sourcesquid.co/india-atlas/states/haryana/)

Travel
    Confirmed with you before you pay1,770 km from our Bengaluru office, straight line

Languages
    Hindi and HaryanviOur team speaks Hindi

Nearest seaport
    Deendayal (Kandla), 910 kmGandhidham, Gujarat

Nearest ICD
    ICD Garhi Harsaru, 60 kmInland container depot for customs clearance and rail to port

Within 250 km

## Covered on the same trip.

[ 60 km away · Haryana **Panipat** home furnishings, rugs and blankets Factory audit in Panipat  ](https://sourcesquid.co/quality/audit/panipat/)[ 70 km away · Haryana **Gurugram – Manesar** two-wheelers and cars, garment export houses and electronics Factory audit in Gurugram  ](https://sourcesquid.co/quality/audit/gurugram/)[ 80 km away · Delhi **Delhi – Okhla** fashion garments, embroidery and sampling studios Factory audit in Delhi  ](https://sourcesquid.co/quality/audit/delhi/)[ 80 km away · Haryana **Rewari – Dharuhera – Bawal** auto parts and brassware Factory audit in Rewari  ](https://sourcesquid.co/quality/audit/rewari/)

Distances are straight-line from Rohtak. Tell us every factory on your list and we plan one route.

More for Rohtak: [pre-shipment inspection in Rohtak](https://sourcesquid.co/quality/inspection/rohtak/), [sourcing agent in Rohtak](https://sourcesquid.co/sourcing/rohtak/) and the [Rohtak cluster guide](https://sourcesquid.co/india-atlas/clusters/rohtak/). Already have a factory in mind? See the [supplier background report](https://sourcesquid.co/services/supplier-kyc/) and [ready audit reports](https://sourcesquid.co/services/audit-reports/).

Audit in Rohtak

## Straight answers.

Anything else, ask us directly. A principal replies, not a bot.

[anirudh@sourcesquid.co](mailto:anirudh@sourcesquid.co)

### What do you check at a Rohtak hand tools supplier?

The seven areas of every audit: quality system, capacity, machines and maintenance, inspection controls, traceability, and social, environment and safety basics. For forging, the auditor also asks: Do you receive a mill test certificate (EN 10204 3.1) for every bar lot and verify its chemistry on receipt?

### What does a factory audit in Rohtak cost?

USD 298 per one-day audit, with the scored report, photos, action plan and a review call. Rohtak is outside our main clusters, so travel is quoted before booking.

### How long does fasteners take to make in Rohtak?

Samples 2–4 weeks, production 4–8 weeks. The audit checks real output per line and shift against your plan.

### Can you audit several factories around Rohtak in one trip?

Yes, a day per factory. Panipat (60 km), Gurugram (70 km), Delhi (80 km) and Rewari (80 km) are within 250 km of Rohtak.

### When is a bad time to audit in Rohtak?

Around Guru Nanak Jayanti (24 Nov 2026), Holi (23 Mar 2027) and Raksha Bandhan (17 Aug 2027), when shifts in Haryana run short.

### Which languages will the auditor use in Rohtak?

Factory floors work in Hindi and Haryanvi. Our team speaks Hindi, so workers are interviewed directly. The report is in English.

Book an audit

## Audit your Rohtak factory before the deposit.

Tell us the factory and the product.

[Book an audit](https://sourcesquid.co/quality/book-an-inspection/?type=audit)[Talk to a principal](https://sourcesquid.co/contact/)

USD 298 per 1-day audit
