SOURCESQUID®
EN
Start a brief
Example teardown · E-bike

E-bike teardown: every part, every process.

An electric city bike is 17 parts from 16 kinds of factory, and the battery and hub motor carry over half of its should-cost. This example teardown shows each part’s material, process chain, best sources and the checks we run.

17
parts in the bill of materials
FOB
illustrative should-costs
48 h
for a free teardown of yours
Every part has a process

A bicycle is a supply chain you can ride.

Tap any part to see its material, the process chain that makes it, where it is best sourced, what it should cost and what we inspect. This is how we look at your product.

Example teardowns

Illustrative FOB should-costs at 5,000 units a year. The same teardown works for your product: a tricycle, a seat cover kit, a pump.

01

What an e-bike is made of

The frame is 6061 aluminium tube: extruded, drawn and butted, hydroformed, mitred, TIG-welded, heat-treated to T6 and powder coated. The fork is 4130 chromoly steel. The rear dropouts are investment-cast stainless, the crank arms are forged 6061 aluminium and the chainring is heat-treated 1045 steel.

The electric drive is where the money sits: a 36 V pack of 21700 lithium-ion cells with its battery management board, a 250 W hub motor with a die-cast housing, copper windings and NdFeB magnets, and a display and controller built on a printed circuit board assembly.

02

The process chain, part by part

Tap any part in the drawing to see its chain. A frame runs through tube extrusion, butting, hydroforming, mitre cutting, TIG welding, T6 heat treatment, alignment and powder coating. A crank arm goes from billet to hot forging, trimming, CNC machining and anodising. The motor combines high-pressure die casting, CNC machining of the bearing seats, stator winding and an IP test.

03

Where India is strongest

Ludhiana is India’s bicycle capital and forges cranks, chainrings and many bought-in parts. Rajkot casts and machines precision parts such as dropouts. Pune–Chakan brings forging and an automotive and EV supply base. Noida, Bengaluru and Chennai assemble electronics, which suits the display and controller. Cells and hub motors are usually imported, and the rest of the bill of materials can be split by strength.

04

What drives the cost

In our illustrative should-cost at 5,000 units a year, the battery pack and hub motor are more than half of the bike. After those, the frame is the next largest line: tube grade, weld time, heat treatment and finish decide its price. Volume, the number of frame sizes and colours, and the certification scope move the rest.

05

What we inspect

Weld quality and frame alignment in a jig, fatigue results to ISO 4210, EMC to EN 15194, battery transport testing to UN 38.3 and the labelling the EU Battery Regulation asks for. On the line we check torque, cable routing and a ride test, then run a pre-shipment inspection against an agreed AQL.

Example teardown for illustration. Standards named here are the ones we usually check against; your drawing and target market set the exact scope.

E-bike questions

Straight answers.

Anything else, ask us directly. A principal replies, not a bot.

[email protected]

Can an e-bike be made in India?

Much of it can. Frames, forks, cranks, chainrings, dropouts, tyres, saddles and grips all have capable Indian makers. Cells and hub motors are usually imported today, and pack and controller assembly can move to India when volumes justify it.

Which parts drive the cost of an e-bike?

The battery pack and the hub motor. In our illustrative should-cost they are more than half of the bike, so their specification and source matter more than any single mechanical part.

Which standards apply to an e-bike sold in Europe?

EN 15194 for electrically power assisted cycles, including EMC; ISO 4210 for the safety of bicycle parts; UN 38.3 for shipping the lithium battery; and the labelling and documentation rules of the EU Battery Regulation.

Do you need drawings for a teardown?

No. A sample, photos or a bill of materials is enough to start. Drawings and 3D files make the should-cost and the factory shortlist sharper.

What does a SourceSquid teardown cost?

The first teardown is free and comes back within 48 hours: process chain, best sourcing clusters and what we would inspect.

Your product next

Send us a part. Get the teardown in 48 hours.

Process chain, best sourcing clusters and what we would inspect, from a sample, photos, a bill of materials or drawings. Free.

Chat on WhatsApp+91 98406 98791