Machining and precision
- What dimensional inspection equipment do you have in house?
- Are Cpk studies done on critical dimensions?
- Are CNC programs under revision control, with the first part re-inspected after any program or tool change?
SourceSquid audits auto parts and chemicals suppliers in Aurangabad, Maharashtra: one day on site for USD 298, with a scored report, photos and an action plan. Aurangabad is an established regional cluster, also known for auto components and pharma. Our auditor adds the machining and precision questions to the seven areas every audit scores.
Factory audit in AurangabadUSD 298 per 1-day audit
Aurangabad is one of our main clusters, so travel is included. You see the exact total before you confirm. Audit day: opening meeting, floor walk, record review, worker interviews and a closing meeting; the scored report follows with a review call.
On top of the seven areas, the questions for the processes Aurangabad runs: auto & EV components and chemicals & pharma. Answers are checked against records and the floor.
Our auditor walks the whole process. For Aurangabad's products, these are the steps on that walk.
The audit compares real output per line and per shift with what you plan to order. These are the usual starting points for Aurangabad's processes and products.
Maharashtra is India's largest industrial state, with auto, forging and precision engineering around Pune, Nashik and Aurangabad, textiles in Bhiwandi and Ichalkaranji, foundries in Kolhapur, and jewellery and packaging in Mumbai. The Aurangabad cluster guide has the full record.
Audit days are best booked clear of them, when the full shift is on the floor. Full year: holiday planner.
Aurangabad is one of our main clusters, so travel is included. Distances are straight-line from the city centre.
Distances are straight-line from Aurangabad. Tell us every factory on your list and we plan one route.
More for Aurangabad: pre-shipment inspection in Aurangabad, sourcing agent in Aurangabad and the Aurangabad cluster guide. Already have a factory in mind? See the supplier background report and ready audit reports.
Anything else, ask us directly. A principal replies, not a bot.
[email protected]The seven areas of every audit: quality system, capacity, machines and maintenance, inspection controls, traceability, and social, environment and safety basics. For machining and precision, the auditor also asks: What dimensional inspection equipment do you have in house?
USD 298 per one-day audit, with the scored report, photos, action plan and a review call. Aurangabad is one of our main clusters, so travel is included.
Samples 4–8 weeks, production 6–10 weeks. The audit checks real output per line and shift against your plan.
Yes, a day per factory. Nashik (160 km), Pune (220 km), Silvassa (250 km) and Bhiwandi (250 km) are within 250 km of Aurangabad.
Around Ugadi / Gudi Padwa (7 Apr 2027), Raksha Bandhan (17 Aug 2027) and Ganesh Chaturthi (4 Sep 2027), when shifts in Maharashtra run short.
Factory floors work in Marathi. Our team speaks Marathi, so workers are interviewed directly. The report is in English.
Tell us the factory and the product.