Pune – Chakan. Forgings, auto and EV and precision engineering.
Pune – Chakan, in Maharashtra, is a major national manufacturing cluster for forgings, auto parts and machined parts. Buyers come here for forgings, auto and EV and precision engineering.
Named shortlist from USD 390
- 110 km
- to Nhava Sheva seaport
- Marathi
- on the factory floor
- 730 km
- from our Bengaluru office
- Pune
- Nearby clusters
- Seaport
- Inland depot (ICD)
- Nearest seaport
- Nhava Sheva (JNPA) · 110 km
- Nearest ICD
- ICD Pithampur · 490 km
Pune, the short version.
What the cluster makes, who works there, and how goods leave. Distances are straight-line from the city centre.
- Known for
- Forgings, auto and EV and precision engineering
- Processes
- Forging, Auto & EV components, Machining & precision
- State
- MaharashtraOne of 8 clusters mapped in Maharashtra
- Languages
- MarathiOur team speaks Marathi
- Scale
- Major clusterA major national manufacturing cluster
- Nearest seaport
- Nhava Sheva (JNPA), 110 kmNavi Mumbai, Maharashtra
- Nearest ICD
- ICD Pithampur, 490 kmInland container depot for customs clearance and rail to port
- State ports
- Nhava Sheva (JNPA) and ICD Nagpur
- From Bengaluru
- 730 kmSourceSquid's India office
What Pune does best.
3 process families, each with its own page of methods, materials and buying tips.
Made in Pune, step by step.
Open a product to see its process chain. Each links to the full guide with QA tests, HS heading and lead times.
Investment castings (steel, stainless)6 steps · Samples 5–7 weeks including wax tooling
- Wax pattern injection · Aluminium die makes a wax replica of the part
- Ceramic shell building · Dipped and stuccoed in layers, then dried
- Dewax & pour · Shell fired, molten alloy poured at controlled temperature
- Knock-out & heat treatment · Normalising, hardening or solution annealing to spec
- CNC finishing · Critical faces and threads machined
- Inspection & PPAP · Chemistry, hardness, CMM report, first-article approval
Machined & welded assemblies6 steps · Samples 4–6 weeks
- Material & cutting · Certified bar, plate and tube cut to size
- CNC turning & milling · VMC/HMC and turn-mill centres
- Welding · MIG/TIG with qualified welders and fixtures
- Stress relief & finish · Heat treatment, blasting, plating or painting
- Assembly · Sub-assemblies with torque records
- Inspection · CMM, weld inspection, FAI report
Tube bending & TIG-welded frames6 steps · Samples 4–6 weeks including fixtures
- Tube sourcing · ERW or seamless, steel, stainless or aluminium
- CNC bending · Mandrel bending to CLR on multi-stack benders
- End forming & notching · Flaring, swaging and laser notching
- Jig welding · TIG on fixtures for repeatable geometry
- Finish · Powder coat, chrome or passivation
- Check fixture inspection · Go/no-go fixture plus CMM on first articles
Injection-moulded plastic parts with textures6 steps · Tooling and T1 samples 5–8 weeks
- DFM & mould flow · Wall thickness, draft and gate review
- Tool build · P20/H13 steel mould built in-house or by a tool room
- Texture · Mold-Tech or VDI texture applied to the cavity
- T0/T1 trials · Parts moulded, measured and adjusted
- CMF approval · Colour, gloss and texture signed off against master
- Production & PPAP · Process locked, capability study, first shipment
Cargo nets, webbing & strap kits6 steps · Samples 2–4 weeks
- Yarn · Polyester or nylon high-tenacity yarn
- Narrow weaving & knotting · Webbing looms and net knotting machines
- Dyeing & heat setting · Colour fastness and dimensional stability
- Hardware · Hooks, buckles and cam fittings sourced and tested
- Sewing & assembly · Bar-tack stitching to pattern
- Break-load testing · Every lot tested to rated load
Filter bags & anti-static pouches6 steps · Samples 2–3 weeks
- Media selection · Needle felt, anti-static grids, PTFE membranes
- Cutting · Ultrasonic or hot-knife cutting
- Seaming · Sewn, welded or taped seams
- Rings & fittings · Snap bands, collars and grounding straps
- Testing · Surface resistivity and air permeability
- Clean packing · Sealed, labelled per batch
Electronics & PCB assemblies6 steps · Prototypes 3–5 weeks
- DFM & BOM check · Component availability and alternates
- SMT · Paste print, pick-and-place, reflow
- THT & wave · Through-hole parts and selective soldering
- AOI & X-ray · Automated optical and BGA inspection
- Functional test · Test jig built to your procedure
- Conformal coat & box build · Coating, enclosure and final pack
Automotive seat covers & trim6 steps · Samples 3–4 weeks
- Material · PU leather, fabric, foam laminates
- CAD cutting · Automated cutting to digital patterns
- Stitching · Twin-needle and decorative stitching
- Embossing & welding · HF welding or embossed logos
- Fitment check · On a buck or real seat
- Pack · Kitted per vehicle set
Plastic pallets & returnable packaging6 steps · Standard designs 2–4 weeks; new tooling 10–14 weeks plus production
- Design & load spec · Static, dynamic and racking loads defined
- Tooling · Large-tonnage injection or blow mould
- Moulding · HDPE or PP, virgin or recycled blend
- Reinforcement · Steel tubes or ribs for racking
- Load testing · ISO 8611 style load and drop tests
- Branding & tracking · Hot stamp, RFID or QR
Closed-die forgings and flanges7 steps · Dies and samples 5–8 weeks
- Billet cutting · Certified bar cut to weight by shear or bandsaw
- Induction heating · Billet heated to forging temperature
- Closed-die forging · Hammer or press forging through preform and finish impressions
- Trimming & piercing · Flash trimmed and holes pierced in a press
- Heat treatment · Normalising, or hardening and tempering, to specification
- Shot blasting & machining · Scale removed; faces, bores and threads machined
- Inspection · Hardness, MPI or UT, dimensional report
Fasteners (bolts, nuts, screws)6 steps · Samples 2–4 weeks
- Wire rod & annealing · Rod drawn to size and spheroidise-annealed
- Cold heading · Heads formed on multi-station headers
- Thread rolling · Threads rolled for strength and accuracy
- Heat treatment · Hardening and tempering to property class
- Plating or coating · Zinc, zinc-flake or hot-dip galvanising
- Testing & packing · Proof load, hardness and coating checks; boxed by count
Machined auto components7 steps · Samples 4–8 weeks
- Material · Bar, forging or casting with mill certificate
- CNC turning · Multi-spindle and CNC lathes
- Milling & drilling · VMC or HMC operations
- Heat treatment · Induction hardening or case carburising
- Grinding · Bearing seats and critical diameters ground
- Inspection & PPAP · CMM, SPC data and PPAP submission
- Rust-proof packing · VCI packing in returnable trays
Sheet-metal enclosures and brackets7 steps · Samples 2–4 weeks
- Nesting & laser cutting · Sheet nested and cut on fibre lasers
- Punching & bending · Louvres and features punched, then CNC press-brake bending
- Welding & grinding · MIG, TIG or spot welding; seams ground
- Pretreatment · Degreasing and phosphate or zirconium pretreatment
- Powder coating · Colour and texture to RAL
- Hardware & gaskets · Inserts, hinges, locks and gaskets fitted
- Inspection · Dimensions, coating thickness, IP check where specified
Wire harnesses and cables6 steps · Samples 2–4 weeks
- Wire & terminal sourcing · Wire, terminals and connectors to the BOM
- Cut, strip & crimp · Automatic cut-strip-crimp machines
- Crimp validation · Pull-force and cross-section checks
- Layout on board · Harness routed on a full-size assembly board
- Taping & sleeving · Tape, conduit, grommets and labels
- Electrical test · Continuity and hipot test on every harness
Aluminium and zinc die castings7 steps · Die and samples 6–8 weeks
- Die design & build · H13 steel die with cooling and ejection
- Melting · Aluminium (ADC12, A380) or zinc (Zamak 3, Zamak 5) alloy
- High-pressure die casting · Cold-chamber machines for aluminium, hot-chamber for zinc
- Trimming & deburring · Runners, overflows and flash removed
- Machining · Threads, bores and sealing faces
- Finishing · Powder coating, e-coating or plating
- Inspection · X-ray for porosity, dimensions, leak test if needed
Clusters close to Pune.
Useful when one trip should cover several suppliers, or when a part needs a process Pune does not run.
Maharashtra's GI products.
57 registered GI products come from Maharashtra, with 17 more applications pending. A few of them:
See all 57 in Maharashtra- Bhiwapur Chilli Tea, coffee & spices
- Hupari Silver Craft Jewellery & gems
- Karvath Kati Sarees & Fabrics Handloom sarees & fabrics
- Kavdi Maal of Tuljapur Other crafts & goods
- Kolhapuri Chappal Leather & footwear
- Miraj Sitar Musical instruments
- Miraj Tanpura Musical instruments
- Nandurbar Mirchi (Chilli) Tea, coffee & spices
- Paithani Saree & Fabrics Handloom sarees & fabrics
- Pen Ganesh Idol Glass & ceramics
Your team in Pune.
Our Bengaluru team covers Pune in person: factory search, audits, samples and inspections. This is what working with us there looks like.
- Factory search on the groundOur Bengaluru team visits Pune to screen factories in person, then shares a named shortlist with the evidence behind it.
- Audits before you commitOn-site audits of the strongest Pune candidates, scored on capability, quality systems and capacity.
- Samples to golden sampleFirst articles measured against your drawing, then a signed golden sample that every lot is checked against.
- Inspections on every lotIn-line and pre-shipment inspections in Pune to your AQL, with photo and measurement reports.
- We speak MarathiThe language of Pune's factory floors, so questions get answered at the machine, not after a week of email.
- Shipping via Nhava ShevaWe plan the route to Nhava Sheva or ICD Pithampur, and check export documents before the truck leaves.
Straight answers.
Anything else, ask us directly. A principal replies, not a bot.
[email protected]What is Pune – Chakan known for manufacturing?
Pune – Chakan is known for forgings, auto and EV and precision engineering. It is a major national manufacturing cluster in Maharashtra, and its main product groups are forgings, auto parts and machined parts.
Which port is nearest to Pune – Chakan?
The nearest seaport is Nhava Sheva (JNPA), about 110 km away in a straight line. The nearest inland container depot is ICD Pithampur, about 490 km away. Exporters in Maharashtra commonly ship through Nhava Sheva (JNPA) and ICD Nagpur.
How do I find good manufacturers in Pune – Chakan?
Send SourceSquid a short brief with a drawing, photo or sample. We return a named shortlist of Pune manufacturers screened on evidence, then audit the strongest on site before you place an order.
Get a named shortlist of Pune manufacturers.
Send one drawing, photo or quote. We return how it is made, the right factories in the cluster and a realistic target price.